ToC
64-724

Special provisions for other buildings within flood zones

Non-complying buildings may be elevated or reconstructed to an increased height, which at all points does not exceed the difference between flood-resistant construction elevation and the applicable datum from which height is measured pursuant to the underlying regulations. Such elevation or reconstruction may create a new non-compliance or increase the degree of an existing non-compliance.

Top